## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021

## Subject Name:  Estimation &amp; Costing

| w. e. f. Academic Year:   | 2025-26   |
|---------------------------|-----------|
| Semester:                 | 4 th      |
| Category of the Course:   | PCC       |

| Prerequisite:   | Students  should  be  comfortable  reading  civil  engineering  drawings  and  confident with math and measurement skills.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        |
|-----------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
| Rationale:      | Accurate estimation helps engineers figure out the total construction cost,  wisely allocate resources, and set realistic budgets-essential steps before  any project starts. In construction, a cost are shaped not just by material  specification but also by equipment rentals and labor charges, so carefully  calculating  quantities  and  creating  clear  specifications  is  key  to  keeping  expenses under control and avoiding surprises.  As  green  building  practices  become  more  common,  knowing  how  to  estimate  the  costs  of  sustainable  materials  and  methods  is  increasingly  valuable. Additionally, using estimation software streamlines the process,  improves  accuracy,  and  makes  it  easier  to  update  budgets  as  project  details change.  This  course  equips  diploma  civil  engineers  with  hands-on  skills  in  all  these areas-traditional estimating,  green building costing, and software  tools-so  they're  ready  for  the  challenges  of  today's  construction  projects. |

## Course Outcome:

After Completion of the Course, the Student will able to:

|   No | Course Outcomes                                                                     | RBT  Level   |
|------|-------------------------------------------------------------------------------------|--------------|
|   01 | Use appropriate measurement methods for various types of works.                     | R & U        |
|   02 | Perform rate analysis for different items associated with various projects.         | R, U, &  A   |
|   03 | Draft approximate estimation for various civil infrastructural projects.            | U, & A       |
|   04 | Prepare detailed estimate of various civil infrastructural projects.                | A            |
|   05 | Use appropriate programs/software's for estimating the quantity and cost of  items. | U & A        |

*Revised Bloom's Taxonomy (RBT)

<!-- image -->

## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021

Subject Name:  Estimation &amp; Costing

## Teaching and Examination Scheme:

| Teaching Scheme  (in Hours)   | Teaching Scheme  (in Hours)   | Teaching Scheme  (in Hours)   | Total  Credits  L+T+ (PR/2)   | Assessment Pattern and Marks   | Assessment Pattern and Marks   | Assessment Pattern and Marks   | Assessment Pattern and Marks   | Total   |
|-------------------------------|-------------------------------|-------------------------------|-------------------------------|--------------------------------|--------------------------------|--------------------------------|--------------------------------|---------|
| L                             | T                             | PR                            | C                             | Theory                         | Theory                         | Tutorial / Practical           | Tutorial / Practical           | Marks   |
| L                             | T                             | PR                            | C                             | ESE (E)                        | PA (M)                         | PA (I)                         | ESE (V)                        | Marks   |
| 03                            | 00                            | 02                            | 04                            | 70                             | 30                             | 20                             | 30                             | 150     |

## Course Content:

|   Unit  No. | Content                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |   No. of  Hours |   % of  Weightage |
|-------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-----------------|-------------------|
|           1 | Fundamentals of Estimating and Costing: 1.1 Estimating  and  Costing-  Meaning,  purpose,  Administrative  approval, Technical Sanction and Budget provision.  1.2 Classification of estimates- Approximate and Detailed estimate.  1.3 Types  and  Uses  of  Estimates:  Revised  estimate,  Supplementary  estimate, Repair and maintenance estimate, renovation estimate.  1.4 Approximate estimate- Definition, Purpose.  1.5 Methods  of  approximate  estimate  -  Service  unit  method,  Plinth  area  rate  method,  Cubical  content  method,  Typical  bay  method,  Approximate quantity method (with simple numericals)  1.6 Approximate  estimate  for  roads,  Railways,  bridges/culvert,  irrigation projects and water supply projects.  1.7 Roles and responsibility of an Estimator.  1.8 Checklist of items in load bearing and framed structure.  1.9 Standard  formats  of  Measurement  sheet,  Abstract  sheet,  Face  sheet.  1.10 Modes of measurement and desired accuracy in measurements for  different  items  of  work  as  per  IS:  1200  -  Earthwork,  Brickwork,  Concrete  work,  Stone  work,  Roof  work,  Floor  work,  Plastering,  Doors and windows, Wood work, Streel work, Whitewashing and  distempering, Painting, etc.  1.11 Rules for deduction in different category of work as per IS: 1200 -  Opening  for  masonry  work,  Deduction  for  lintels  over  openings  Deduction for plastering |              07 |                12 |
|           2 | Specifications of civil engineering works:  2.1 Importance and types specification  2.2 Principles of writing specification  2.3 Description  /  specification  of  items  of  building  work  as  per  PWD/R&B - Earthwork, Brickwork, Concrete work, Stone work,  Roof  work,  Floor  work,  Plastering,  Doors  and  windows,  Wood  work, Streel work, Whitewashing and distempering, Painting, etc.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |              04 |                08 |

<!-- image -->

## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021 Subject Name:  Estimation &amp; Costing

| 3   | Detailed Estimate:  3.1 Detailed  Estimate  -  Definition  and  Purpose,  Data  required  for  detailed  estimate-  Civil  cost,  GST,  Contingencies,  Supervision  charges,  Agency  charges,  Procedure  for  preparation  of  detailed  estimate- Taking out quantities and Abstracting.  3.2 Methods  of  Detailed  Estimate-  Unit  quantity  method  and  total  quantity method (with simple numericals)  3.3 Longwall and Short wall method, Centre line method.  3.4 Bar bending schedule for footing, column, beam, Lintel, chajja and  slab elements  3.5 Provisions  in  detailed  estimate:  contingencies,  work  charged  establishment,  percentage  charges,  water  supply  and  sanitary  Charges and electrification charges etc.  3.6 Prime  cost,  Provisional  sum,  Provisional  quantities,  Bill  of  quantities, Spot items or Site items.   |   18 |   40 |
|-----|--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|------|------|
| 4   | Estimate for Civil Engineering Works:  4.1 Earthwork- Quantities for roads, Embankment and canal by- Mid  sectional  area  method,  mean  sectional  area  method,  Prismoidal  and trapezoidal formula method.  4.2 Detailed estimate for septic tank, Community well.  4.3 Use of computer / softwares / programmes for detailed estimate  Preparation of Civil Engineering Works                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      |   08 |   20 |
| 5   | Rate Analysis: 5.1 Rate Analysis: Definition, purpose and importance.  5.2 Lead (Standard and Extra), lift, overhead charges, water charges  and contractors' profit,  5.3 Procedure for rate analysis  5.4 Task work- Definition, types. Task work of different skilled labour  for different items.  5.5 Categories of labours, their daily wages, types and number of  labours for different items of work.  5.6 Transportation charges of materials- Lead and Lift, Hire charges of  machineries and equipments.  5.7 Preparing rate analysis of different items of work pertaining to  buildings and roads considering sustainable materials - Earth  work, Concrete work, RCC work and First class brick work.                                                                                                                                                     |   08 |   20 |
|     | Total                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    |   45 |  100 |

## Suggested Specification Table with Marks (Theory): (in %)

## Distribution of Theory Marks (in %)

|   R Level |   U Level |   A Level | N Level   | E Level   | C Level   |
|-----------|-----------|-----------|-----------|-----------|-----------|
|        20 |        40 |        40 | -         | -         | -         |

w.e.f. 2025-26

<!-- image -->

## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021

Subject Name:  Estimation &amp; Costing

Where R: Remember; U: Understanding; A: Application, N: Analyze and E: Evaluate C: Create (as per Revised Bloom's Taxonomy)

## References/Suggested Learning Resources:

## (a) Books:

|   S.  No. | Title of Book                                                                | Author                                           | Publication with place, year, and  ISBN                                                                            |
|-----------|------------------------------------------------------------------------------|--------------------------------------------------|--------------------------------------------------------------------------------------------------------------------|
|         1 | Estimating, Costing and  Valuation                                           | Dr. Sandeep  Panchal                             | Khanna Book Publishing Co. (P) Ltd,  New Delhi, ISBN: 978-93-55384-96-6  https://ekumbh.aicte- india.org/dbook.php |
|         2 | Estimating and Costing in  Civil Engineering                                 | B. N. Dutta                                      | UBS Publishers Distributor Pvt. Ltd.  New Delhi   ISBN:9788174767295                                               |
|         3 | Civil Engineering  Contracts   and Estimates                                 | B. S. Patil                                      | Orient Longman, Mumbai, Ed.2010   ISBN: 9788173715594, 8173715599                                                  |
|         4 | Estimating construction  cost (fifth edition),                               | Peurifoy, Robert  L.Oberlender,  Garold,         | McGraw Hill Education, New Delhi                                                                                   |
|         5 | Estimating and Costing in   Civil Engineering                                | S. C. Rangwala                                   | Charotar Publishing House PVT.  LTD., Anand (Gujrat) Pin 388001    ISBN: 9789385039058                             |
|         6 | Estimating and Costing                                                       | G. S. Birdie                                     | Dhanpat Rai Publishing Company (P)  Ltd. New Delhi-110002   ISBN : 9789384378134                                   |
|         7 | Estimating and Costing                                                       | Prof. V. N.  Vazirani and  Prof. S. P.  Chandola | Khanna Publishers   ISBN-10  :  8174091270   ISBN-13  :  978-8174091277                                            |
|         8 | Estimating and costing,   specification and valuation   in civil engineering | M. Chakraborti                                   | Monojit Chakraborti, Kolkata (2006)   ISBN-10: 818530436X   ISBN-13: 9788185304366                                 |
|         9 | CPWD Schedule of Rates                                                       | CPWD                                             | Published under the Authority of   Director General, CPWD, New Delhi                                               |
|        10 | R & B Schedule of Rates                                                      | R & B, Gujarat  State                            | R & B, Gujarat State                                                                                               |

<!-- image -->

## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021

Subject Name:  Estimation &amp; Costing

## (b) Open-source software and website:

1. https://ekumbh.aicte-india.org/dbook.php
2. https://cpwd.gov.in/Documents/cpwd\_publication.aspx
3. https://watersupply.gujarat.gov.in/documents/folder/sor-schedule-of-rates-10
4. https://www.nptel.iitm.ac.in
5. https://www.youtube.com/@NOUCS-vd4mc/videos

## Suggested Course Practical List:

|   Exp .  No. | List of Practicals                                                                                                                                                                                                                                         | Unit  No.   |   Approx.  Hrs.  required |
|--------------|------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-------------|---------------------------|
|            1 | Prepare the list of items to be executed with units for detailed  estimate of a given structure from the given drawing.                                                                                                                                    | 1,3         |                         1 |
|            2 | Prepare a report on market rates for given material , labour  wages, hire charges of tools & equipments required to  construct the given structure as mentioned in at Serial number  1 above.                                                              | 1,3 & 5     |                         1 |
|            3 | Study of items with specification given in the R&B SOR (any  four items) - Earthwork, Brickwork, Concrete work, Stone  work, Roof work, Floor work, Plastering, Doors and windows,  Wood work, Streel work, Whitewashing and distempering,  Painting, etc. | 2           |                         2 |
|            4 | Recording in Measurement Book (MB) for any four items as  mentioned in at Serial number 3 above.                                                                                                                                                           | 3           |                         1 |
|            5 | Prepare bill of quantities of given item from actual  measurements (any four items) as mentioned in at Serial  number 3 above.                                                                                                                             | 3           |                         1 |
|            6 | Prepare approximate estimate for the given civil engineering  works - Roads, Railways, bridges/culvert, irrigation projects  and water supply projects.                                                                                                    | 2           |                         2 |
|            7 | Calculate the quantity of items of work from the given set of  drawings using standard measurement sheet for load bearing  residential structure using description of item from R&B SOR  (l BHK Building with staircase).                                  | 3           |                         2 |
|            8 | Prepare detailed estimate from the given set of drawings using  'standard measurement and abstract format' for RCC framed  structure using description of item from R&B SOR along with  face sheet and prepare quarry chart, lead statement ( G+1          | 3           |                         4 |
|            9 | Building) Calculate the reinforcement quantities from the given set of  drawings for a room size of 3 m x 4 m with bar bending  schedule (footing, column, beam, lintel with chajja, slab)                                                                 | 3           |                         4 |
|           10 | Prepare rate analysis for Earth work, Concrete work, RCC  work and First class brick work.                                                                                                                                                                 | 5           |                         2 |

Page 5 of 6

<!-- image -->

## GUJARAT TECHNOLOGICAL UNIVERSITY

Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021

## Subject Name:  Estimation &amp; Costing

| 11   | Prepare detailed estimate of road of one kilometer length from  the given drawing.   | 4     |   2 |
|------|--------------------------------------------------------------------------------------|-------|-----|
| 12   | Prepare detailed estimate of small Septic tank from the given  set of drawings.      | 4     |   2 |
| 13   | Prepare detailed estimate of well from the given set of  drawing.                    | 4     |   2 |
| 14   | Use the relevant software to prepare detailed estimate of a  Road.                   | 4     |   2 |
| 15   | Use the relevant software to prepare detailed estimate of a  residential building.   | 4     |   2 |
|      |                                                                                      | Total |  30 |

## List of Laboratory/Learning Resources Required:

|   S.  No. | Equipment/Resource Name                                       | Practical  No.   |
|-----------|---------------------------------------------------------------|------------------|
|         1 | Computer system (A computer system with latest configuration) | 14 & 15          |
|         2 | Estimator software, REVIT and MS Excel                        | 14 & 15          |

Suggested Project List: As per the Suggested Course Practical List

## Suggested Activities for Students:

- (A) Prepare seminar on relevant topic
- (B) Site visit of residential building, Road work, Canal, Well, Septic tank
- (C) Collect current SOR from CPWD / R&amp;B and prepare report on it
- (D) Undertake micro project
- (E) Prepare models of various civil engineering works and building components

* * * * * * *